GMTS Kakinada Logo

Sub Sea Structures

1. Mud Mats

We have fabricated 02 Nos Mud Mats for their sub sea requirement. We have fabricated this Mud Mat as per the design provided by M/S Technip France in 02 pieces using Scheduled pipes and rubber fenders specially molded through Rubber manufacturers. These 02 sections each weighing 20 Tons (Approx) have been shifted to Port area alongside the jetty and joined together by welding and clamping.

Mud Mats by GMTS
Mud Mats by GMTS
Base plate for Mud Mats

2. Wet Parking Frames

We have fabricated 06 nos wet parking frames during the years 2008 & 2009. The wet parking frames have been fabricated of various designs. We have also carried out load testing of one of the wet parking frames to a test load of 55 Tons after fabrication to ascertain our quality. The load testing for such huge load was undertaken using Granite blocks and placing them on the frame platform.

Load Testing of Wet Parking frames at GMTS
Wet Parking frames at GMTS